Overview
Deploying stacks using Valex Cloud Orchestration is a streamlined process that leverages the power of declarative templates. This article covers how to launch, update, and manage stacks using either HOT or CF templates.
Deployment Process
- Template Preparation:
Write your template using your preferred syntax (HOT or CF). Ensure that all required parameters, resources, and outputs are defined. - Validation:
Use the orchestration service’s built-in validation tool to check the syntax and logical consistency of your template. - Stack Creation:
Submit your template via the cloud panel or API. The system will create a stack, provisioning all resources as defined. - Monitoring & Updates:
Monitor the stack’s progress and view logs. If you need to update the stack, modify the template and perform a stack update. - Rollback & Deletion:
In case of errors, utilize rollback features to revert to a previous stable state, or delete the stack if it is no longer needed.
Best Practices
- Modular Templates:
Break down complex environments into smaller, reusable templates. - Parameterization:
Use parameters to make your templates flexible and adaptable to different environments. - Version Control:
Store your templates in a version-controlled repository to track changes and facilitate collaboration. - Automated Deployments:
Integrate with CI/CD pipelines to automate the deployment and update processes.