Overview

Deploying stacks using Valex Cloud Orchestration is a streamlined process that leverages the power of declarative templates. This article covers how to launch, update, and manage stacks using either HOT or CF templates.

Deployment Process

  1. Template Preparation:
    Write your template using your preferred syntax (HOT or CF). Ensure that all required parameters, resources, and outputs are defined.
  2. Validation:
    Use the orchestration service’s built-in validation tool to check the syntax and logical consistency of your template.
  3. Stack Creation:
    Submit your template via the cloud panel or API. The system will create a stack, provisioning all resources as defined.
  4. Monitoring & Updates:
    Monitor the stack’s progress and view logs. If you need to update the stack, modify the template and perform a stack update.
  5. Rollback & Deletion:
    In case of errors, utilize rollback features to revert to a previous stable state, or delete the stack if it is no longer needed.

Best Practices

  • Modular Templates:
    Break down complex environments into smaller, reusable templates.
  • Parameterization:
    Use parameters to make your templates flexible and adaptable to different environments.
  • Version Control:
    Store your templates in a version-controlled repository to track changes and facilitate collaboration.
  • Automated Deployments:
    Integrate with CI/CD pipelines to automate the deployment and update processes.
War diese Antwort hilfreich? 55 Benutzer fanden dies hilfreich (210 Stimmen)